Name: Chongqing Fang Tai new building materials Co., Ltd.
Cell phone: 18680891886
乐发II500Phone: 023-88365054
Fax: 023-88929344
Official website: bypiju.com
乐发II500Address: Chongqing Jiulongpo Branch City Road No. 68, No. 9-1
乐发II500Introduction of barrier free handrail installation process: 1. Put the armrest in the place where the installation needs to be installed, and adjust the appropriate installation size according to the user's habits and needs. 乐发II5002, use the marker pen to mark the hole in the hole in the installation hole. It is suggested that a hole should be hit first. 3. The bolt hole of M8 is hit in the hole of the installation hole of the hole ring of the drawing, and the depth of the perforation is about 60MM. 乐发II5004, put the nylon expansion bolt into the hole, install the armrest with the stainless steel bolt, adjust the direction of the handrail after the bolt is tightened, verify the size, and adjust the bolt, then use other holes to punch holes on the marker strokes and remove the products. 乐发II5005, use the electric drill to paint the installation holes of the marked injection ring and put it into the nylon expansion bolt. After the armrest is installed again, check whether the screw is fastened, and end the installation of this set of products. | |
Introduction of collision avoidance handrail installation process: 1, put on a wall in the horizontal line (recommended the installation height of handrail by vertical distance under side and ground for the 80mm-85mm), will be fixed on the wall, 25mm installation support line recommended spacing distance, the installation distance to less than 80mm/, measuring the actual installation of the length of the wall, and then use the actual installation length minus elbow length (each elbow length 12.5mm/), and cutting aluminum reserve according to the calculation of good length. In 2, the prepared aluminum in accordance with the corresponding spacing where lay empty, then the aluminum profile is fixed on the wall. 乐发II500In 3, aluminum installed on the elbow and retain a certain gap of convenient adjustment, the bearing is arranged on the aluminum section and screw down the screws. 4, to Aluminum Alloy and elbow are fixed, the actual length of the need to install the PVC panel measurement between the elbow and cut the PVC panel, according to the requirements of the PVC panel button on the aluminum section with a file connection panel and place polished neatly trimmed elbow.
| |